Year at a glance »
Financial highlights for 2010.
Environmental highlights for 2010.
Performance »

Lewisham, Building Schools for the Future (‘BSF’)
Costain is part of the Learning21 consortium, delivering the London Borough of Lewisham’s BSF programme.
Read more
Riverside Resource Recovery Facility (‘RRRF’), Belvedere
The RRRF Energy from Waste facility at Belvedere, on the River Thames, is a strategic river-served waste management facility for London.
Read more
Cleaner Seas for Sussex waste water treatment scheme, Brighton & Hove
This scheme, when complete it will treat approximately 95 million litres of water each day.
Read more
M53 Bidston Moss viaduct strengthening
The Bidston Moss viaduct on the Wirral carries the M53 over a railway and roundabout towards the Kingsway Tunnel and Liverpool.
Read more
Farringdon station redevelopment
Costain, in joint venture, is rebuilding Farringdon station as part of the Thameslink programme.
Read more
Redeveloping Gatwick’s North Terminal
Gatwick Airport (‘GAL’) are increasing the annual capacity of the North Terminal (‘NT’) by four million passengers by 2012.
Read more
Holford underground gas storage project
Costain is currently constructing a gas processing plant for E.ON’s salt cavern gas storage facility, to store gas when demand is low and then release it during peak demand.
Read more
Trawsfynydd Strategic Integrated Framework (‘TSIF’)
The TSIF consists of Costain and three strategic partners, working as an integrated team, along with the customer.
Read more
Annual Report 2010 »

We show how our strategy ‘Choosing Costain’ is based on meeting national needs in terms of Infrastructure, Environment and Energy & Process. (PDF Download)
- Give us feedback
Contact us
Costain House, Vanwall Business Park, Maidenhead, Berkshire, SL6 4UB.
Tel: 01628 842444, info@costain.com

