We use cookies to help improve your online experience. If you continue to use our website, we will assume that you’re happy with this.
Learn more about cookies and how to change your settings in our Privacy and cookies policy.

Cryogenic design of LNG floating production vessel

Costain supported Kanfa Aragon by providing engineering expertise in the design of the liquefaction section of the FLEX LNG FPSO topsides, bringing extensive cryogenic experience in gas processing and LNG to the project.

  • Service 1

Kanfa Aragon

  • Service 1

Consultancy & advisory

Challenges

1.7 million tonnes/annum

LNG produced by the facility

Modular design

of topside facilities

Flexible operation

capable of handling a range of field gas compositions

The floating LNG facility was designed to produce in excess of 1.7 million tonnes of LNG per annum, processing a range of feed gas compositions. The topside facilities are modular in design and consist of a field specific section, conditioning the incoming gas to a specification suitable for processing in a generic section. The generic section incorporates a gas pre-treatment plant for the removal of carbon dioxide, water and mercury, and a two-train liquefaction system. The generic section has the potential to be replicated on further LNG Producer vessels.

Costain was awarded the contract to continue providing engineering services through to detailed design and package management, bringing extensive cryogenic experience in gas processing and LNG to the project.

Contact

Robert Pitman

Business Development Director – Oil & Gas

Tel:  07881090536

[email protected]

 

*All images on this page courtesy of FLEX LNG and Samsung Heavy Industries

Contact and social

Energy

Rob Phillips, Sector Director
0161 910 3444
[email protected]