We use functional cookies for a number of reasons, such as keeping the Costain website reliable and secure and to analyse how our site is being used.
Will you accept our use of non-essential cookies?



Yes No Privacy Notice

Platform at London Bridge Station

More services and better connections for London Bridge commuters

The redevelopment of London Bridge Station will meet growing transport needs by increasing both passenger and rail capacity at the station by 40 percent.

  • Service 1

Network Rail

  • Service 1

2013 to 2018

  • Service 1
  • Service 1

Advisory and concept development
Programme management

key benefits

99%

of waste diverted from landfill

30

jobs for local people who were unemployed

Off-site fabrication

delivered significant programme benefits

£1.8m+

spent with 20 local suppliers

We are carrying out the detailed design and delivery of this major infrastructure project, including a new concourse at street level which will increase passenger capacity from circa 50 million to 75 million.

Costain employee walking by rail track
*Photograph by kind permission of Network Rail

The London Bridge project has engaged in an array of sustainability initiatives and practices. The project strives to maintain a fit and healthy workforce, to reduce our use of natural resources, eliminate waste, maximise our talent and skills, integrate business into the community and help tackle the issue of low employment in the London Borough of Southwark.

Construction at London Bridge station
*Photograph by kind permission of Network Rail

By developing our people, creating an equal and inclusive workplace, minimising our environmental impacts and improving local communities we will build a successful business and help create a railway fit for the future.

Gren Edwards, Sector Director, Rail, Costain

Contact and social

Rail

Lee Davies, Client director
01628 842 444
[email protected]