NGL Extraction and Fractionation in Egypt

The client was intending to design and build an NGL extraction and fractionation plant on the Egyptian coast with associated refrigerated propane storage. Costain provided consulting expertise to enable the desired outcome to be achieved.

  • Service 1

United Gas Derivatives Company

  • Service 1
  • Service 1

Advisory and Concept Development
Specialist Design

Challenges

1100 MMSCFD

extraction and fractionation

>99% NGL Recovery

Refrigerated propane storage

Costain provided technical and project management services to the project team in Cairo up to the award of Front End Engineering Design. Services provided included:

  • Conceptual design studies including evaluation of process licensors
  • Evaluation of process options
  • Engineering studies including safety and environmental assessments
  • Project cost estimation including benchmarking against Independent Project Analysis (IPA) work
  • Planning and schedule assessment
  • Technical and contract documentation for FEED tender prequalifications and bid for the process plant, propane storage and export facilities and interconnecting pipelines

Costain also co-ordinated the technical interfaces at the Damietta site between the NGL Project and the adjoining LNG Project.