Conceptual Design and Cost Estimate of LNG Facilities in Egypt

Costain carried out a comparison study on two LNG facilities, to provide RWE Dea with the due diligence required to incorporate into their commercial risk assessment.

  • Service 1

RWE Dea

  • Service 1
  • Service 1

Advisory & Concept development
Specialist design

Challenges

Provide technical and preliminary cost information

to allow client to make equity decision

Identify issues affecting plant performance

Forecast project cost and schedule

Information to undertake the study was obtained from public domain literature, a site visit, discussions with client engineers and commercial staff, and evaluations based on Costain’s experience of cryogenic gas processing and liquefaction plants.

Costain produced a conclusion that enabled RWE Dea to make an equity decision and subsequently completed a conceptual design and capital cost estimate for the gas conditioning facilities that would be required upstream of the proposed LNG facilities.