We use cookies to help improve your online experience. If you continue to use our website, we will assume that you’re happy with this.
Learn more about cookies and how to change your settings in our Privacy and cookies policy.

Keeping the lights on for Luton and Dunstable communities

We maintained the region’s power supply during the construction of a new dual carriageway to improve journeys for long distance traffic currently travelling through Dunstable.

  • Service 1

UK Power Networks

  • Service 1
  • Service 1
  • Service 1

Advisory and Concept Development
Specialist Design
Programme Management

  • Service 1

2015

Costain completed a temporary diversion prior to the permanent diversion of the PBA and PVA 132kV circuits for UK Power Networks as an enabling package for Highways England’s A5-M1 link scheme.

Our team coordinated the construction and outage programme to achieve wider project objectives with the underground cable contractor, local authority by-pass contractor and Highways England link road contractor.

Costain managed all overhead line outage planning, permit issuing and undercrossing interfaces which helped minimise disruption to the UK Power Networks’ end users. The temporary diversion of the overhead circuits allowed another contractor to successfully complete the installation of a new 132kV underground cable with minimal disruption to the local community.

Significant 3rd party interface management was undertaken to ensure minimal disruption to the local community during final conductor and tower removal as per of the diversion works.

The programme sequenced to mitigate critical path interfaces.

Contact and social

Power

Cameron Tonkin, Sector director
0121 389 9300
[email protected]